Work Experience Power Blueprint Engineers LLC |
||
|
|
|
|
|
Client |
MCS International LLC |
|
|
Contract No |
|
|
|
Project Name |
Reverse Osmosis and Thermal deaerator installation in the gas-fired steam boiler plant of MCS Coca-Cola factory. |
|
|
Scope of work |
Study, calculation, and detailed engineering design. BIM modelling. |
|
|
License |
TZ-8 Design of Energy Facilities |
|
|
Duration |
July 2025 to Aug 2025 |
|
|
|
|
|
|
Client |
Energy Resource LLC, MCS International LLC |
|
|
Contract No |
PO2025/07/39046 |
|
|
Project Name |
5.6 MW Heating plant of Tsetsii district, Tsogttsetsii soum, Umnugovi aimag |
|
|
Scope of work |
Detailed engineering design and the design author’s inspection. |
|
|
License |
TZ-8 Design of Energy Facilities |
|
|
Duration |
July 2025 to Dec 2025 |
|
|
|
|
|
|
Client |
Governor of Dundgovi province |
|
|
Contract Number |
2025/25 |
|
|
Project Name |
Waste separation and incineration heating plant in Saintsagaan soum, Dundgovi aimag, 6th khoroo |
|
|
Scope of work |
Detailed engineering design |
|
|
License |
TZ-8 Design of Energy Facilities |
|
|
Duration |
March 2025 – June 2025 |
|
|
|
||
|
Client |
Tuv Chandmani |
|
|
Contract Number |
2025/25 |
|
|
Project Name |
Rehabilitation work for the heating boiler place No3 and No4. in Tuv province, Mongolia |
|
|
Scope of work |
Detailed engineering design |
|
|
License |
TZ-8 Design of Energy facilities |
|
|
Duration |
March 2025 – June 2025 |
|
|
|
||
|
Client |
Ministry of Energy, MonEnergy Consult LLC |
|
|
Contract Number |
MEC25.01.23 |
|
|
Project Name |
Detailed engineering design of a 158MW CFB heat only boiler plant in Baganuur district, Ulaanbaatar. |
|
|
Scope of work |
Detailed engineering design of the boiler and mechanical systems. Subcontractor of MonEnergy Consult LLC |
|
|
License |
TZ-8 Design of Energy facilities |
|
|
Duration |
Feb 2025 – Dec 2025 |
|
|
|
|
|
|
Client |
Ulaanbaatar Ger Area development Project, ADB, MonEnergy Consult LLC |
|
|
Contract Number |
MEC25.02.15 |
|
|
Project Name |
Construction of a 63MW CFB heat only boiler plant in Dambadarjaa, Ulaanbaatar. |
|
|
Scope of work |
Design author’s supervision of boiler and Mechanical systems. Subcontractor of MonEnergy Consult LLC |
|
|
License |
TZ-8 Design of Energy facilities |
|
|
Duration |
Feb 2025 – ongoing |
|
|
|
|
|
|
Client |
“Darkhan Thermal Power Plant” TPP. |
|
|
Contract Number |
2025.09.10 |
|
|
Project Name |
Forced air-cooling tower installation at the “Darkhan Thermal Power Plant” TPP. |
|
|
Scope of work |
Detailed engineering design |
|
|
License |
TZ-8 Design of Energy facilities |
|
|
Duration |
Sep 2025 – ongoing |
|